TO: BOARD OF TRUSTEES

ITEM NO:

FROM: PRESIDENT

 

SUBJECT: Analy Hall Ventilation System Hazardous Substance Removal Project, Ratification and Award of Bid

DATE
10/10/00

REASON FOR BOARD CONSIDERATION

CONSENT

ENCLOSURES

1 of 1

BACKGROUND

Bids were received from two (2) prospective contractors for the Analy Hall Ventilation System Hazardous Substances Removal Project. In addition to the base bid, there were three deductive alternate items (3) for which cost information was required.

Contractor Base Bid Alt. A Alt. B Alt. C _

Carr's Construction (Windsor) $127,890.00 ($22,500.00) ($ 9,000.00) ($250.00)

Reliance Enterprises (Santa Rosa) $189,887.00 ($30,000.00) ($25,000.00) ($500.00)

The pre-bid construction estimate was $128,000.00. Staff recommends taking the low base bid and reject all deductive alternates for a total project cost of $127,890.00

 

 

 

 

 

 

 

 

BUDGET IMPACT

$127,890.00 State Hazardous Substances (100%)

 

 

ADMINISTRATIVE RECOMMENDATION

It is recommended that the Board of Trustees ratify and award the low bid, in the amount of $127,890.00, rejecting all deductive alternates, to Carr's Construction, of Windsor, for the Analy Hall Ventilation System Hazardous Substances Removal Project.